Metric glossary

Plain-language definitions, units and examples for workforce planning. The same definitions appear beside key metrics throughout LoughPoint.

38 definitions found

Staffing

Staffing balance

Available FTE minus required roster FTE. Positive means surplus capacity; negative means a shortfall. Compare the same scope and paid-hours basis. A net surplus does not guarantee interval or skill coverage.

Related calculator and worked example →

Staffing

Hiring gap

Additional roster FTE needed: maximum of zero and required FTE minus available FTE. Zero means no net hiring need. See Staffing balance for surplus or shortfall.

Explore the calculation library →

Staffing

FTE — full-time equivalent

Staffing expressed as full-time paid hours, rather than the number of people. Two people working 20 hours each equal 1 FTE when a full-time week is 40 hours.

Related calculator and worked example →

Staffing

Current staffing

The paid FTE capacity you enter for the shared setup or a location. It is compared with demand-side requirements and constrains schedule recommendations. Leave blank if unknown; zero means no staff. Dated changes can alter future supply.

Related calculator and worked example →

Staffing

Required roster FTE

The full-time-equivalent staffing calculated to cover demand, service requirements and shrinkage, using paid hours per FTE. It is a requirement estimate, not a fitted shift schedule.

Related calculator and worked example →

Staffing

Staffing gap

Available FTE minus required FTE. If 120 are required and 100 available, the signed gap is −20 FTE (a shortfall). If 90 are required, the gap is +10 FTE (a surplus). Hiring shortfall is the positive amount needed to close a negative gap.

Related calculator and worked example →

Staffing

Net agents

Agents needed to be available for service before adding shrinkage. Depending on channel, this includes the service target or workload-clearance requirement.

Related calculator and worked example →

Staffing

Shrinkage

The share of paid time unavailable for handling work, such as leave, absence, training and meetings. A 70-agent net need at 30% shrinkage requires 70 ÷ 0.70 = 100 scheduled agents.

Related calculator and worked example →

Demand

AHT — average handling time

Average time spent handling a contact, including relevant talk, hold and after-contact work. Check whether imported values use seconds or minutes.

Related calculator and worked example →

Demand

Workload hours

Total handling time represented by demand: contacts × AHT seconds ÷ 3,600. Effective concurrency can reduce occupied agent time for chat. Workload alone is not roster FTE.

Related calculator and worked example →

Demand

Offered contacts

Contacts arriving in the selected queue and period. These can differ from answered or completed contacts; cost per offered contact uses arrivals.

Related calculator and worked example →

Service

Occupancy

The share of available service time occupied by handling work. It excludes shrinkage from the available-time denominator. A calculated load above 100% signals overload or inconsistent inputs, not a sustainable operating occupancy.

Explore the calculation library →

Service

Utilisation

Productive time as a share of a stated time base, often total paid time. Check the denominator: it may differ from occupancy, so the two should not be used interchangeably.

Related calculator and worked example →

Service

Effective chat concurrency

The average number of contacts handled simultaneously. Use achievable overlap, rather than the maximum number of chats the system allows.

Related calculator and worked example →

Service

SLA — service level agreement

The agreed service commitment. For synchronous work it may specify a percentage answered within seconds; for back-office work it may specify completion within hours or days. A model estimate is not a guarantee.

Related calculator and worked example →

Service

Service level

The percentage of eligible contacts answered within the chosen threshold. State the threshold and denominator, including any short-abandon exclusions.

Related calculator and worked example →

Service

ASA — average speed of answer

Average waiting time before an answered contact reaches an agent, usually in seconds. It is different from handling time and depends on the reporting policy for abandoned contacts.

Explore the calculation library →

Service

Abandonment rate

The percentage of offered contacts that leave before answer. Short-abandon policies affect the reported percentage. Erlang C does not predict abandonment.

Related calculator and worked example →

Service

Erlang C

A queueing model for waiting and staffing estimates. It assumes steady-state arrivals, identical agents and no abandonment; use appropriate interval data and review its assumptions.

Explore the calculation library →

Staffing

Shift coverage

Scheduled agents compared with required agents in each interval. Percentage of intervals covered counts intervals meeting the requirement; it is not a customer service-level percentage.

Related calculator and worked example →

Costs

Loaded cost per FTE

Monthly cost for one FTE, using the salary, employer costs and overheads you choose to include. Example assumptions need replacing with your own costs.

Related calculator and worked example →

Costs

Required staffing cost

Estimated cost of the calculated requirement using the selected charging basis, subject to any minimum monthly charge. It is not automatically the payroll cost of available FTE.

Related calculator and worked example →

Forecasting

Time grain

The time represented by one data point: for example 15 minutes, an hour or a month. Uploaded grain and the level used for forecasting can differ.

Related calculator and worked example →

Forecasting

WAPE — weighted absolute percentage error

Total absolute forecast error divided by total actual demand, expressed as a percentage. Lower is better on comparable holdouts; it is unavailable when total actual demand is zero.

Related calculator and worked example →

Forecasting

RMSE — root mean squared error

Square root of average squared forecast error. It uses the original units and gives large misses greater weight than MAE.

Related calculator and worked example →

Forecasting

Backtest

A historical test that forecasts withheld observations using only earlier data. It estimates past forecasting performance, not guaranteed future accuracy.

Related calculator and worked example →

Scenarios

Baseline

The reference case against which a scenario is compared. Keep its assumptions unchanged to interpret the effect of a scenario. A percentage change from a zero baseline is unavailable.

Related calculator and worked example →

Forecasting

Correlation

A measure of association between two metrics, ranging from −1 to +1 for Pearson correlation. It does not establish causation; missing data and sample size matter.

Related calculator and worked example →

Still need help? Send feedback or email hello@loughpoint.com.